It is located in the Port of Lázaro Cárdenas, a strategic place for the distribution of fuels with
respect to the regional consumption centers of Bajío, Occidente-Sur and Costa Chica Grande de Guerrero.
The objective TPP of this project is to contribute to the supply of refined products to the Pacific and central Mexican markets..
It TPP has an existing dock of 180 meters, a draft of 15.30 meters (50.20 ft) for
the unloading of large volume oil products; It will also have a wide
area for direct transfer to simple or full pipes under the principle of products
fully supported and potentially distributed.
TPP has the OIL TANK STORAGE PERMIT No. PL/21621/ALM/2018 granted by the CRE to carry out the oil tank storage activity.
The project is currently in the development phase and financing process,
Therefore, there is no estimated construction start date.
- Nominal and operational capacity of the Terminal.
The project consists of the reception, unloading, storage and delivery of crude oil,
refined and additives. The reception of the products will be carried out through a tanker and
the discharge will be carried out through the ship's own pumping system, the oil tankers
will be stored in 9 atmospheric type tanks, with a capacity of
nominal storage of 535 Mb.
- Methodology to determine the Operating Capacity and the Available Capacity
of the System, as well as the Capacity certification opinions.
The available capacity in the system is the result of the differential between capacity
operating capacity and reserved capacity through service provision contracts.